How to install a Classicbond One Piece EPDM rubber roof
-
The ClassicBond One Piece EPDM system is great for large or small flat roof areas and is normally bonded on to a timber deck in one piece so no joins!
Find out more!
Step by Step Installation Guide
-
Roof Deck Preparation
Clean the roof surface prior to installation
Be sure the roof surface is clean, free of dust, dirt, rust, oil, grease, and loose material. The roof surface must be dry. This product will not adhere to wet surfaces. Trapped moisture may vaporize and negatively affect the performance of this product. This system is best installed onto a timber deck either exterior grade ply or OSB3.
Any residual bitumen from an old roof should either be removed or over boarded as this will adversely affect the performance of the EPDM rubber membrane.
-
Install Drip Batten
Install the Drip batten wherever a gutter is present. This will extend the roof deck so that water run off drips in to the gutter rather than behind the gutter.
-
Install Drip Back Drip Trim
The Drip Trim has a front and back piece. Install theDrip Trim backplate using the nails provided. Align the curved top edge of the trim with the timber batten.
-
Chase out Wall Upstand
Chase out brick mortar joint using angle grinder or mortar chisel ready to accept Wall Trim flashing.
-
Relax Rubber Membrane
Allow the rubber membrane to relax in position for 30 minutes.
-
Fold Membrane Halfway
Fold the rubber membrane back to expose half of the roof deck.
-
Apply Deck Adhesive
Apply Water Based Deck Adhesive using a 9" paint roller. Leave a 150mm un-bonded area around the roof deck perimeter for bonding later with Contact Adhesive
Roll the EPDM membrane back in to position immediately whilst the adhesive is STILL WET
If the adhesive dries out (becomes opaque) before the membrane is relayed then a thin coat can be applied to the back of the MEMBRANE and allowed to dry before installing. Apply adhesive to smaller area in hot weather to avoid premature drying.
(Water based adhesives should only be used when the outside temperature is 4 degrees and rising and no chance of freezing conditions in the following 24-48 hours)
-
Sweep EPDM Membrane
Sweep EPDM membrane to remove trapped air and improve bonding to substrate.
-
Apply Contact Adhesive to Roof Perimeter
Apply a THIN coat of Contact Adhesive to the roof deck perimeter (approximately 150mm width) and any vertical upstands. Also apply the Contact Adhesive to the back of the rubber membrane.
Contact Adhesive can also be used to bond the rubber membrane to most porous and non-porous surfaces so can be used in place of water based deck adhesive if necessary
-
Ensure Contact Adhesive is Touch Dry
Ensure the Contact Adhesive is touch dry and there are no puddles of adhesive.
The Contact Adhesive gives off a vapour as it cures. If the membrane is bonded before the Contact Adhesive has fully dried bubbles/blisters may appear. These bubbles should disappear over time due to the EPDM membrane being breathable.
-
Cut Back Excess Material
Trim any excess material from walls and upstands using the chase out as a guide.
-
Cut Elastoform to size
Elastoform is used to waterproof profiles in the roof shape which can not be achieved with the rubber membrane such as external corners.
Cut 9" Elastoform to size allowing upstand height plus an extra 75mm on the length by 150mm on the width. (75mm on to rubber & 75mm on to Brick/render).
-
Apply Rubber Primer
Apply an even coat of EPDM Rubber Primer using a paint brush to an area slightly larger than the Elastoform patch.
-
Ensure Primer is Touch Dry
Ensure primer is touch dry.
-
Install Elastoform
Install Elastoform Tape.
When installing Elastoform always bond the area which requires no stretching first, leaving the stretching part until last.
Keep the Elastoform in a warm place in cold weather as this will aid the moulding process.
-
Apply Pressure to Elastoform
Apply pressure to Elastoform to ensure fully bonded.
-
Stretch Elastoform
Stretch Elastoform.
-
Penny Roller Detail
Apply light pressure using penny roller to ensure Elastoform bonds to all surfaces.
-
Install Wall Trim
Install Wall Trim in to chased out mortar join.
-
Drill Wall Trim
Drill Wall Trim and wall with 7mm masonry drill to accept rawlplug.
-
Install RawlPlug
Install RawlPlug.
-
Install Fastener
Install Fastener.
-
Install Mastic to Wall Trim and Wall Slot
Apply mastic to wall trim and wall chase out.
-
Folding the Rubber Membrane on a Roof Corner
The membrane can be folded without cutting when detailing an external roof corner prior to installing edge trims.
-
Form Pigs Ear
Pinch the rubber membrane together to form a pigs ear.
-
Fold Pigs Ear
Fold pigs ear on to side of roof.
-
Fit Trim Corner
Place the trim corner in position apply pressure to squash the foam sealer and nail the polypins in to fascia and batten.
-
Fit Plastic trim Kerb Edge
The Plastic trim Kerb Edge is designed to deflect water back on to the roof. (traditionally this would be achieved with an arris rail).
Cut the kerb edge trim to length and apply pressure to the top of the trim and then polypin to secure
The foam should be compressed by 70-80%
-
Fit Trim Joining Clip
Snap the joint clips provided in to position.
-
Fit plastic trim Drip or Gutter Trim
Fit plastic trim Drip or Gutter front trim using polypins provided and install jointing clips where necessary.
-
Trim Excess Rubber Membrane
Trim the excess rubber membrane with a sharp knife or scissors. Take care not to score the fascia or gutter.
-
Completed Rubber Roof
The completed rubber roof has a life expectancy of 50+ years and will require very little maintenance throughout its life.