Product change notice: Please be informed our Sure Edge and Metal Trims are now 2m long.

How Long Does It Take To Install A ClassicBond Roof?

Generally, installing a ClassicBond roof can be a very quick job if you have basic knowledge about the preparation and the correct steps to take.

Some factors will affect the installation time such as the current substrate, size and type of roof; along with if there is any detail work required such as skylights.

Our friends over at RoofScout have made a great video showing you exactly how long it takes to install ClassicBond on a freestanding, timber-boarded log cabin.

For Sam, it took him just under a 1hour and 30minutes. He did install this roof alone and installed edge trims which make a difference to the installation time.

Check out RoofScout's video below.

You may be interested in
  1. 6 Inch Cover Tape

    6 Inch Cover Tape

    £14.52 £12.10
  2. Lap Sealant

    Lap Sealant

    £13.86 £11.55
  3. Water Based Deck Adhesive

    Water Based Deck Adhesive

    From: £33.00 £27.50
  4. Flat Rubber Roof Kits

    Flat Rubber Roof Kits

    £355.46 £296.22
  5. ClassicBond EPDM Primer

    ClassicBond EPDM Primer

    From: £8.40 £7.00
  6. Orangery Roof Kits

    Orangery Roof Kits

    £488.04 £406.70
  7. EPDM Porch Roof Kits

    EPDM Porch Roof Kits

    £202.90 £169.08
  8. Garden Room Roof Kits

    Garden Room Roof Kits

    £204.25 £170.21
  9. Pipe Boot

    Pipe Boot

    From: £60.00 £50.00
Back to top