How Long Does It Take To Install A ClassicBond Pro Roof?

This will depend on the current substrate, size and type of roof; along with if there is any detail work required such as skylights.

Our friends over at RoofScout have made a great video showing you exactly how long it takes to install ClassicBond Pro on a freestanding, timber-boarded summer house.

For Sam, it took him just under 2 hours and 15 minutes. He did install this roof alone and installed edge trims which make a difference to the installation time.

Check out RoofScout's video below.

You may be interested in
  1. 6 Inch Cover Tape

    6 Inch Cover Tape

    Your Price: £13.07 £10.89 RRP: £14.52 £12.10
  2. 9 Inch Elastoform Uncured EPDM Tape

    9 Inch Elastoform Uncured EPDM Tape

    Your Price: £21.98 £18.32 RRP: £24.42 £20.35
  3. Water Based Deck Adhesive

    Water Based Deck Adhesive

    From: £29.70 £24.75
  4. External Corner Patch Uncured Tape

    External Corner Patch Uncured Tape

    Your Price: £6.94 £5.78 RRP: £7.70 £6.42
  5. DuoPly

    ClassicBond Pro Fleece Reinforced EPDM - 18.58m2

    Your Price: £513.00 £427.50 RRP: £570.00 £475.00
  6. ClassicBond Pro PU Decking Adhesive 5 Litres

    ClassicBond Pro PU Decking Adhesive 5 Litres

    Your Price: £93.96 £78.30 RRP: £104.40 £87.00
  7. Sprayable Contact Bonding Adhesive 500ml

    Sprayable Contact Bonding Adhesive 500ml

    Your Price: £11.34 £9.45 RRP: £12.60 £10.50
Back to top